ECONOMIC MODEL & PREVENTED-DAMAGE METHODOLOGY

Prevented-Damage and Return-on-Investment Calculator for MITR Sentinel & Z3 Gate

When enterprise workflows transition to autonomous tool-calling agents, the primary financial exposure stems from low-frequency, high-severity execution failures on tiers R4 and R5 rather than model inference fees. A single unauthorized wire transfer, an accidentally purged litigation record, or an outbound personal data leak erases an entire year of automation savings.

Use the interactive model below to estimate annual prevented operational losses and audit engineering savings for a specific daily tool-call volume.

1. Interactive Annual Impact Model

WORKLOAD VOLUME & INCIDENT EXPOSURE PARAMETERS
ESTIMATED ANNUAL FINANCIAL IMPACT WITH MITR GATEWAY
Intercepted R4–R5 violations / total high-risk calls per year 29 / 36 500
Prevented direct operational and regulatory damage 13 050 000 RUB
Saved engineering & compliance audit preparation cost 1 180 800 RUB
Net annual benefit after Protection-117 enterprise license 13 642 800 RUB
Estimated license payback period 15 days

2. Three Verifiable Drivers of Gateway Return on Investment